J Lance Project Army

PDF-1.6 158 0 obj gt endobj xref 158 55 0000000016 00000 n 0000002045 00000 n 0000002111 00000 n 0000002617 00000 n 0000002654 00000 n 0000003270 00000 n 0000003384 00000 n 0000003855 00000 n 0000004254 00000 n 0000005055 00000 n 0000005167 00000 n 0000005436 00000 n 0000008307 00000 n 0000008449 00000 n 0000008476 00000 n 0000009097 00000 n 0000009855 00000 n 0000010133 00000 n

The project office returned to MICOM's jurisdiction on 1 August 1974. The LANCE Project Office was terminated on 31 March 1980, and responsibility for the missile system transferred to the MICOM Weapon Systems Management Directorate WSMD. Level II management of the system was subsequently provided by the MICOM Missile Logistics Center later

American short range ballistic missile, which replaced the Little John, Sergeant and Honest John rockets in US Army service in the 1970's. Retired in 1992. AKA MGM-52. Status Active. First Launch 1996-08-22. Last Launch 2009-03-26. Number 8 . Planning began in the late 1950s for more modern technology replacements of second generation Army

The Army is currently reconsidering how it views its installations as part of the battle space under multi-domain operations, which includes, Project Report Summary and Recommendations. By James P. Allen, Natalie R. Myers, Thomas A. Carlson, James T. Stinson, Richard J. Liesen, Lance L. Larkin, Ben Eubanks, and Juan L. Davila-Perez

Established under the U.S. Army Ordnance Missile Command AOMC as the Missile quotBquot Project Office on 11 December 1961, the subsequently renamed LANCE was one of the original project management

This introductory film was developed and produced by the U.S. Army in 1985 to provide familiarization with the Lance field artillery missile system. It was intended primarily for future Lance system crewmen and was not intended to provide specifics on how the system was operated.

The Lance was originally scheduled for retirement in the 1980s, in 1985 however, the Department of the Army extended the shelf-life of the nuclear Lance to 1995.

The Lance project manager reports directly to the Commanding General, U.S. Army Materiel Command. The project is based at Redstone and is attached to the U.S. Army Missile Command for administrative and logistics support. Col. Proudfoot has been project manager of the Shillelagh missile system at the Missile Command since June 1968.

View Lane J. Lance's profile on LinkedIn, a professional community of 1 billion members. Curriculum DeveloperInstructor Advisor at Vinnell Arabia I retired as a Colonel from the U.S. Army on

Jean Vettel, Brent Lance, Chris Manteuffel, Matthew Jaswa, Marcel Cannon, Tony Johnson, Victor Paul, and Kelvin Oie 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAMES AND ADDRESSES U.S. Army Research Laboratory ATTN RDRL-HRS-C Aberdeen Proving Ground, MD 21005 8. PERFORMING ORGANIZATION REPORT NUMBER